- Track: 08, arms control and verification (nuclear safeguards, CWC, BWC, New START, CTBT, secret programmes caught and missed, proposals for AI treaties and their verification).
- Date: 2026-11-27. Every source below was opened on this date.
- Scope: what each regime verifies, through which channels, each channel's known detection
record, and the timeliness logic; bearing on D3, D4, the multi-channel verification guarantee
and the failure analysis in
research/00-memo.md.
Summary: what matters most for Subcritical
- The nuclear precedent does not set detection time shorter than conversion time. The 2001 IAEA glossary says detection time "should correspond approximately to estimated conversion times", and its timeliness goals (1 month unirradiated direct-use, 3 months irradiated, 1 year indirect-use) sit at or above the conversion times (7-10 days for metal, 1-3 weeks for pure compounds, 1-3 months irradiated, 3-12 months LEU). So the margin m is about 1, and below 1 for metal. The memo's "organising idea" says the opposite and must be corrected. The 2022 glossary no longer prints numeric timeliness goals at all (my text search found none); it uses State-level "technical objective performance targets".
- Timeliness covers detection only, never response. Conversion time explicitly excludes assembly "nor any subsequent time period"; the Board-to-Security-Council path has no clock. Cochran (2005) argues that this leaves "insufficient time" for any response. D4's T_r must include response, and there is no nuclear precedent for a guaranteed response time.
- Declared material is watched on a timescale of months; undeclared programmes were found after years, mostly by intelligence, defectors or disclosure. DPRK's false declaration was caught by IAEA accountancy and sampling within about 9 months (1992-93). But Iraq (about 10 years), Libya (about 20+), Iran's centrifuge work (17), Syria's reactor (about 6), Fordow (about 3 to 7), Biopreparat (16) and South Africa (about 15 active years) were not caught by the inspectorate's own channels. The IAEA "identifies suspect locations mainly through voluntary tips from national intelligence agencies" (Baker 2023). For an AI regime, the realistic T_r for an undeclared programme is years, unless new channels change that.
- No CWC challenge inspection has ever been requested (OPCW EC-109/DG.22, July 2025), against 8,649 routine inspections since 1997. A challenge inspection is not random: a state must request it and accuse another state. The memo's "random challenge inspections on the chemical-weapons model" mixes two mechanisms, and its placeholder of 4 a year reaching a site has a realised precedent of 0.
- Channels do not multiply. Baker et al. (2025): a regime's detection probability is "approximately that of the subgoal with the lowest probability of detecting a violation", because an evader routes around the strongest channel. Channels are also correlated (inspections follow intelligence tips). The memo's combined miss probability has to be computed per acquisition path, minimised by the evader, as the IAEA's acquisition path analysis does.
- D4's inequality is prior work. Barnett and Scher (MIRI, May 2025) state that nations "must be able to detect and respond to dangerous AI development faster than any single country's breakout time". Gan (arXiv, 3 Nov 2026) formalises it as min{D + l, R} < T_catch, with catch-up time shrinking as compute grows (12 to 5.74 months over a 24-month pause). D4 should be downgraded from "new" to "extends prior work".
- Regimes switch off. DPRK refused special inspection and gave NPT withdrawal notice within five weeks of the request (1993). The IAEA has not verified Iran's roughly 440.9 kg of 60% HEU since 10 June 2025 (more than 8 months by February 2026, against a monthly guideline). New START's data exchanges stopped in 2023 and the treaty expired on 5 February 2026. The BWC never had verification; the US rejected the 2001 protocol because dual-use biology makes inspection uninformative, the closest analogue to algorithmic progress at fixed compute.
- The strongest technical detection record is the CTBT's, where the event is physically loud: seismic thresholds "well below 1 kt worldwide" (0.22 kt at 90% confidence with good propagation), and DPRK's sub-kiloton 2006 test seen by 22 stations. Compute has a comparable signature only for large concentrated sites; Iraq buried power lines to Tarmiya to hide its load.
Sources
iaea-glossary-2022
- Title: IAEA Safeguards Glossary, 2022 Edition (International Nuclear Verification Series No. 3 (Rev. 1)).
- Organisation: International Atomic Energy Agency. Year: 2022 (printed October 2022).
- Identifier: ISBN 978-92-0-122222-0 (pdf); copy opened at https://www.bnl.gov/ispo/docs/iaea-sgs-glossary.pdf (text extracted from the PDF).
- Opened: 2026-11-27.
- What it says:
- 3.19 Significant quantity: "The approximate amount of nuclear material for which the possibility of manufacturing a nuclear explosive device cannot be excluded. SQs take into account unavoidable losses ... and should not be confused with critical masses." Table 1: Pu 8 kg (for Pu with less than 80% Pu-238); U-233 8 kg; HEU (U-235 at or above 20%) 25 kg U-235; LEU, natural, depleted 75 kg U-235 (or 10 t natural U or 20 t depleted U); thorium 20 t.
- 3.20 Conversion time: "Conversion time is used to determine timely detection requirements under the Safeguards Criteria." It assumes facilities exist, processes tested, non-nuclear components made. "It does not include the time required to transport diverted material to the conversion facility, the time required to assemble the device, nor any subsequent time period." Table 2: Pu, HEU or U-233 metal "Order of days (7-10)"; pure oxides, nitrates, MOX, scrap "Order of weeks (1-3)"; in irradiated fuel "Order of months (1-3)"; U below 20% and thorium "Order of months (3-12)".
- 3.21 Detection time: "An estimate of the time available for detection of a step in an acquisition path (e.g. the time from diversion until the end of the path)."
- 3.14-3.15 Acquisition path analysis: the "plausible paths by which ... nuclear material suitable for use in a nuclear weapon ... could be acquired"; a path is "A sequence of steps which a State could follow to acquire one significant quantity". 3.23 performance target, e.g. "the required detection probability for the diversion of 1 significant quantity (SQ) of nuclear material within a period of time".
- 3.16-3.17 protracted vs abrupt diversion; 3.29 timeliness component: no "abrupt diversion of 1 significant quantity (SQ) or more at a facility during a calendar year".
- 2.5 generic objectives under a CSA: detect diversion at declared facilities, undeclared production at declared facilities, and "any undeclared nuclear material or activities in the State as a whole".
- 2.11 Deterrence: "through the risk of early detection. Thus, although essentially non-quantifiable, the level of deterrence may be expected to be higher the greater the IAEA's detection capabilities."
- 5.46 MUF = (PB + X - Y) - PE, the "difference between book inventory and physical inventory" (quoting INFCIRC/153 para. 111). 9.6 Diversion into MUF: "if sigma_MUF is large ... then the probability of detection of diversion into MUF is low." 9.21: significance intervals "typically by using 0 +/- 2 sigma_MUF or 0 +/- 3 sigma_MUF".
- 9.22 and 9.31: false alarm probability "generally set to a small value (e.g. 1 %)". 9.30 detection probability "combines selection probabilities and identification probabilities". 9.32: verification levels "random low, medium and high (with (1 - beta) = 0.2, 0.5 and 0.9, respectively)", and "the achieved detection probability ... is not necessarily as large".
- 9.10 sample size n = N(1 - beta^(1/D)).
- 3.25: fresh fuel verification "with 50% detection probability for gross defects" as an example intensity.
- 10.17 and 10.26: a facility with less than 5 ekg gets at most one routine inspection a year (INFCIRC/153 para. 79); maximum routine inspection effort 50 person-days a year for reactors and sealed stores; for Pu and HEU facilities the formula in para. 80 applies with a floor of 450 person-days a year; otherwise (100 + 0.4L) person-days a year. (The radical in "30 x L" is lost in the text extraction; I did not open INFCIRC/153 itself, which blocked automated access.)
- 10.18: advance notice of routine inspections at least 24 hours for Pu or U above 5%.
- 10.27: complementary access under the AP; wide-area environmental sampling needs Board approval first.
- A text search of the 2022 edition for "timeliness goal" and "one month" finds no numeric timeliness goals (unlike the 2001 edition below).
- Bears on: D3 (conversion time as the nuclear breakout analogue), D4 (timeliness vs conversion), the multi-channel guarantee (detection probability levels; acquisition path analysis), P4 (MUF: detection fails when throughput is large relative to measurement accuracy, the same failure as hiding training in large declared fleets).
iaea-glossary-2001
- Title: IAEA Safeguards Glossary, 2001 Edition (International Nuclear Verification Series No. 3).
- Organisation: IAEA. Year: 2002 (2001 edition).
- Identifier: ISBN 92-0-111902-X; https://www-pub.iaea.org/MTCD/Publications/PDF/NVS3_scr.pdf
- Opened: 2026-11-27.
- What it says:
- 3.20 IAEA timeliness detection goal, where no AP is in force or no broader conclusion drawn: "One month for unirradiated direct use material, Three months for irradiated direct use material, One year for indirect use material." "Longer timeliness detection goals may be applied" where the absence of undeclared material has been concluded.
- 3.15 Detection time: "the maximum time that may elapse between diversion ... and detection"; under the conversion assumptions "detection time should correspond approximately to estimated conversion times".
- 3.13 Conversion time, same Table I as 2022 (7-10 days; 1-3 weeks; 1-3 months; 3-12 months). The diversion is "assumed to be part of a planned sequence of actions chosen to give a high probability of success ... with minimal risk of discovery until at least one such device is manufactured."
- 3.16 Detection probability: "The values of 1 - beta_a currently in use are 90% for 'high' and 20% for 'low' probability levels." 3.17 false alarm "usually set at 0.05 or less".
- Bears on: D4 directly. The goals equal, and for metal exceed, conversion times: the nuclear margin m is about 1, and the goal is detection, not response.
cochran-2005
- Title: Adequacy of IAEA's Safeguards for Achieving Timely Detection (Draft 2).
- Author: Thomas B. Cochran (NRDC), for the Nonproliferation Policy Education Center. Year: 2005 (1 October 2005).
- Identifier: https://npolicy.org/adequacy-of-iaeas-safeguards-for-achieving-timely-detection/
- Opened: 2026-11-27.
- What it says: Conclusions: "IAEA safeguards are inadequate for achieving the objective of timely detection." For unirradiated metal the one-month goal "is too long, and timely warning cannot be achieved." Actual inspection frequencies fall below the goals because of "resource limitations and resistance of member countries". There is "insufficient time" for the Board to report to the Security Council. NRDC proposed reducing SQ values for Pu and HEU "by a factor of about eight"; "The IAEA's SQ values are technically erroneous and excessive." A large declared reprocessing plant "could divert an SQ of plutonium without detection over a period of about one month."
- Bears on: D4 (response time absent from the nuclear design), evidence against the memo's reading of nuclear timeliness; the threshold quantity (an SQ analogue for AI can be set too high).
infcirc-540
- Title: Model Protocol Additional to the Agreement(s) between State(s) and the International Atomic Energy Agency for the Application of Safeguards, INFCIRC/540 (Corrected).
- Organisation: IAEA. Year: 1997 (reprinted December 1998).
- Identifier: https://www.iaea.org/sites/default/files/infcirc540c.pdf
- Opened: 2026-11-27.
- What it says: Article 4.a: the Agency "shall not mechanistically or systematically seek to verify the information referred to in Article 2", but has access to locations "on a selective basis in order to assure the absence of undeclared nuclear material and activities". Article 4.b: "advance notice of access of at least 24 hours"; for places on a site already being inspected, "at least two hours but, in exceptional circumstances, it may be less than two hours." Article 4.d: the State gets an opportunity to clarify before access is requested.
- Bears on: the inspection channel (notice periods bound how fast an inspection can see a site; an AI data centre can change workloads in seconds, so short notice matters more than for nuclear material).
iaea-sir-2024
- Title: The Safeguards Implementation Report for 2024: Safeguards Statement.
- Organisation: IAEA. Year: 2025.
- Identifier: https://www.iaea.org/sites/default/files/25/06/sir-2024.pdf
- Opened: 2026-11-27.
- What it says: Safeguards applied for 190 States in 2024. 137 had CSA and AP in force: for 75 "all nuclear material remained in peaceful activities" (the broader conclusion); for 61 only "declared nuclear material remained in peaceful activities"; for one no conclusion. 45 had a CSA without an AP. DPRK excluded: "the Agency did not implement safeguards". Iran: unresolved uranium of "anthropogenic origin at undeclared locations"; Iran "the only NPT non-nuclear-weapon State that is producing and stockpiling high enriched uranium", an estimated "3.9 significant quantities in the form of UF6 enriched up to 60% U-235" at the end of 2024. Resources: material and facilities under safeguards increase "year on year. In contrast, the Agency's financial resources have not risen commensurately."
- Bears on: the inspection channel's coverage (only 75 of 190 States reach the level that addresses undeclared activity); the failure analysis (verification capacity does not grow with the regulated base, as it would need to for compute).
cwc-text
- Title: Convention on the Prohibition of the Development, Production, Stockpiling and Use of Chemical Weapons and on their Destruction (with Article IX and the Verification Annex, Part X).
- Organisation: OPCW (treaty text). Year: 1993 (in force 29 April 1997).
- Identifier: https://www.opcw.org/fileadmin/OPCW/CWC/CWC_en.pdf; Article IX page https://www.opcw.org/chemical-weapons-convention/articles/article-ix-consultations-cooperation-and-fact-finding
- Opened: 2026-11-27.
- What it says:
- Article IX para. 8: a State Party may request an on-site challenge inspection of any site in another State Party "solely" to clarify possible non-compliance, "conducted anywhere without delay". Para. 15: the request goes to the inspected State "not less than 12 hours before the planned arrival of the inspection team at the point of entry". Para. 17: the Executive Council may, within 12 hours, decide "by a three-quarter majority of all its members against carrying out the challenge inspection" if "frivolous, abusive or clearly beyond the scope".
- Verification Annex Part X para. 14: final perimeter "in no case later than 24 hours after the arrival of the inspection team at the point of entry"; transport "completed not later than 36 hours after the arrival". Para. 15(b): declared facilities, arrival at the perimeter within 24 hours. Para. 16: alternative perimeter proposed within 24 hours. Para. 23: exit monitoring of "all vehicular exit activity" begins "Not later than 12 hours after the arrival". Para. 43: pre-inspection briefing "shall not exceed three hours"; managed access for Article III facilities within 12 hours of arrival at the perimeter. Para. 57: "The period of inspection shall not exceed 84 hours, unless extended by agreement". Para. 60: preliminary report within 72 hours of return; para. 61: draft final report within 20 days.
- Bears on: the challenge-inspection channel: time from request to perimeter is 12 + 36 = 48 hours at most, with managed access on top; the inspected State can screen sensitive items.
opcw-ec109-dg22
- Title: Update on the Technical Secretariat's Readiness to Conduct a Challenge Inspection or an Investigation of Alleged Use (EC-109/DG.22).
- Organisation: OPCW Executive Council, Note by the Director-General. Year: 2025 (7 July 2025).
- Identifier: https://www.opcw.org/sites/default/files/documents/2025/07/ec109dg22%28e%29.pdf
- Opened: 2026-11-27.
- What it says: Para. 5: "neither CIs nor IAUs have been requested by any State Party since the Convention's entry into force in 1997." Para. 4: the mechanisms "were envisaged in a different security and political environment from the current one"; instead the Secretariat has run ad hoc contingency operations in Syria, Germany, Iraq, Malaysia, Ukraine and the UK.
- Bears on: the memo's challenge-inspection channel: realised rate 0 per year over 28 years.
opcw-numbers
- Title: OPCW by the Numbers.
- Organisation: OPCW. Year: 2026 (figures as of 30 September 2026).
- Identifier: https://www.opcw.org/media-centre/opcw-numbers
- Opened: 2026-11-27.
- What it says: 193 States Parties. Declared chemical weapons 72,305 t, "100%" destroyed (72,304.34 t). Production facilities: 98 declared, 74 destroyed, 23 converted. Inspections since entry into force, by category: CWPF 527, CWDF 2,064, CWSF 530, OCW 198, ACW 202 (sum 3,521); industry Schedule 1 388, Schedule 2 1,178, Schedule 3 567, OCPF 2,995 (sum 5,128; the page labels this line "Industrial facilities subject to inspection", so the label is ambiguous; the sum of the per-category inspection counts is mine).
- Bears on: contrast between declared-site verification (thousands of routine inspections, complete destruction) and undeclared-site verification (zero challenge inspections).
brugger-2002
- Title: U.S. May Request Chemical Weapons Convention Inspections.
- Author: Seth Brugger, Arms Control Today. Year: 2002 (March).
- Identifier: https://www.armscontrol.org/act/2002-03/press-releases/us-may-request-chemical-weapons-convention-inspections
- Opened: 2026-11-27.
- What it says: "However, to date, no state has ever requested a challenge inspection." The US Under Secretary of State called the OPCW "a very troubled organization" and said "it would be risky to put a big burden on the OPCW." No request followed.
- Bears on: the challenge-inspection channel: even a state publicly weighing a request did not make one. I did not find, in an opened source, a systematic account of why no state has ever requested one; reasons often given (political cost, reciprocity, exposing intelligence) are not recorded here because I did not open a source that states them.
mahley-2001
- Title: Statement by the United States to the Ad Hoc Group of Biological Weapons Convention States Parties.
- Author: Ambassador Donald A. Mahley, US Department of State. Year: 2001 (25 July 2001).
- Identifier: https://usinfo.org/wf-archive/2001/010725/epf314.htm (State Department wire archive).
- Opened: 2026-11-27.
- What it says: "The draft Protocol will not improve our ability to verify BWC compliance." It "will not enhance our confidence in compliance and will do little to deter". Inspections "would still not provide useful, accurate, or complete information." "Almost any facility that does biological work of any magnitude possesses the capability, under some parameters, of being diverted to biological weapons work." The draft "would put national security and confidential business information at risk."
- Bears on: failure analysis: where the dangerous capability lives in dual-use know-how rather than a scarce, countable material, inspection loses its value. Algorithmic progress at fixed compute is the AI case that looks like the BWC rather than the NPT.
littlewood-lentzos-2024
- Title: Strengthening the Biological Weapons Convention.
- Authors: Jez Littlewood, Filippa Lentzos, Arms Control Today. Year: 2024 (December).
- Identifier: https://www.armscontrol.org/act/2024-12/features/strengthening-biological-weapons-convention
- Opened: 2026-11-27.
- What it says: "verification has not been covered by the BWC for more than 20 years", tied to "the U.S. decision in July 2001 to reject the draft version of the verification protocol." The 2022 Working Group was tasked to "identify, examine and develop specific and effective measures, including possible legally binding measures" and "was given 60 days (15 days a year over four years)", with "10 days focused on compliance and verification", which remain "more conceptual". Proposals call for "six additional staff in the ISU". I did not find an opened source on the Working Group's December 2025 outcome.
- Bears on: failure analysis; the baseline that a major weapons regime has run for 50 years with no verification at all.
hoffman-2009
- Title: The other Berlin Wall: How the Soviet bioweapons program was revealed.
- Author: David E. Hoffman, Bulletin of the Atomic Scientists. Year: 2009 (9 November).
- Identifier: https://thebulletin.org/2009/11/the-other-berlin-wall-how-the-soviet-bioweapons-program-was-revealed/
- Opened: 2026-11-27.
- What it says: Western agencies "lacked solid proof" of a Soviet programme. In late October 1989 Vladimir Pasechnik, director of the All-Union Institute of Ultra-Pure Biological Preparations, phoned the British Embassy from Paris to defect. Biopreparat was a cover with "tens of thousands of scientists and support workers" in a "hidden archipelago of laboratories and industrial plants"; plague production "reaching 2 metric tons per year". On the US-UK visit of January 1991 the Soviets worked to hide suspect facilities.
- Bears on: the whistleblower and defector channel (the channel that worked, after about 16 years); the memo's rewarded whistleblowing.
fas-biopreparat
- Title: Biopreparat (Russian and Soviet nuclear forces guide).
- Organisation: Federation of American Scientists. Year: 1998 (last updated 20 October 1998).
- Identifier: https://nuke.fas.org/guide/russia/agency/bw.htm
- Opened: 2026-11-27.
- What it says: Biopreparat set up in 1973, a year after the USSR signed the BWC. Estimates of 25,000 to 32,000 employees across 20 to 30 labs; another estimate of at least 47 facilities and over 40,000 workers. Pasechnik revealed the programme was "ten times larger than estimated" by US or British intelligence. Alibek defected in 1992.
- Bears on: years undetected (1973 to 1989) and the scale a hidden programme reached while intelligence underestimated it by an order of magnitude.
vonbaeckmann-1995
- Title: Nuclear verification in South Africa.
- Authors: Adolf von Baeckmann, Garry Dillon, Demetrius Perricos, IAEA Bulletin 37(1). Year: 1995.
- Identifier: https://www.iaea.org/sites/default/files/publications/magazines/bulletin/bull37-1/37105394248.pdf
- Opened: 2026-11-27.
- What it says: Chronology box: 1974 "Prime Minister approves limited programme for development of nuclear weapons as deterrent"; 1977 Kalahari test site abandoned; 1978 first HEU withdrawn; 1979 first device; 1987-1989 four more devices; November 1989 decision to terminate; 26 February 1990 order to destroy "the six completed nuclear devices and the incomplete seventh"; 10 July 1991 NPT accession; 17-23 March 1993 weapons documentation destroyed; 24 March 1993 announcement to Parliament. Completeness was assessed by isotopic balance of the enrichment plants' output against natural uranium feed; "apparent discrepancies" for the Y-plant and Z-plant were resolved from "several thousand operating records" modelled "on a daily basis". "Information from IAEA Member States was used to confirm that all relevant facilities/locations had been inspected."
- Bears on: D3 (a breakout from a 1974 decision to a first device in 1979, about 5 years); the inspectorate's channel worked only after voluntary disclosure; reconstructing history from operating records is the analogue of auditing training logs after the fact.
thorne-1992
- Title: IAEA nuclear inspections in Iraq.
- Author: Leslie Thorne, IAEA Bulletin 34(1). Year: 1992.
- Identifier: https://www.iaea.org/sites/default/files/publications/magazines/bulletin/bull34-1/34102451624.pdf
- Opened: 2026-11-27.
- What it says: "The known information about Iraq was limited to that acquired from the IAEA's twice yearly inspections of the facilities at the Tuwaitha Nuclear Research Centre", NPT party since 1969; declared areas "occupying not much more than a quarter of the site". "There had been speculation for some years in the press ... but no hard information was available." At Tarmiya inspectors noted "the huge electrical load the site had required", which "did not fit with Iraq's declared use". "Between the first and second missions, a dramatic increase in available intelligence information took place. Reconnaissance photographs showed" equipment being removed; inspectors on a water tower photographed "nearly a hundred heavy vehicles loaded with the equipment". Iraq's 7 July 1991 declaration revealed "nearly 400 tonnes of natural uranium ... which had never been reported to the IAEA before" and "six grams of plutonium that had been clandestinely produced". Documents seized "Acting on information received from intelligence sources" showed the weapons programme "to be large, well-organized, and well-funded".
- Bears on: P4 (the energy signature that inspectors read), the failure of routine safeguards at declared sites to see undeclared ones, intelligence as the channel that made inspection work.
albright-2002
- Title: Iraq's Programs to Make Highly Enriched Uranium and Plutonium for Nuclear Weapons Prior to the Gulf War.
- Author: David Albright, Institute for Science and International Security. Year: 2002 (revised from 1997).
- Identifier: https://isis-online.org/isis-reports/detail/iraqs-programs-to-make-highly-enriched-uranium-and-plutonium-for-nuclear-we
- Opened: 2026-11-27.
- What it says: Iraq decided in late 1981, after Osirak was bombed, to build enrichment capability; EMIS chosen; first separated uranium January 1986. In mid-August 1990 Iraq ordered diversion of its safeguarded HEU fuel in a crash programme aiming at a weapon within six months, halted by the January 1991 bombing. EMIS produced about 1,300 g of mostly low-enriched uranium and "virtually no HEU". The page describes concealment including buried power lines to Al Tarmiya to hide its electricity consumption, and a duplicate site built only by Iraqis.
- Bears on: years undetected (late 1981 to mid-1991, about 10 years); P4 (deliberate masking of the power signature); D3 (the crash programme is a breakout from diverted declared material).
iaea-gov-2011-30
- Title: Implementation of the NPT Safeguards Agreement in the Syrian Arab Republic (GOV/2011/30).
- Organisation: IAEA, Report by the Director General. Year: 2011 (24 May 2011).
- Identifier: https://acronym.org.uk/old/archive/docs/1105/Syria%20IAEA%20Report%20May%202011.pdf (copy of the derestricted report).
- Opened: 2026-11-27.
- What it says: Para. 2: on 2 June 2008 the Director General told the Board the Agency "had been provided with information alleging that an installation at the Dair Alzour site in Syria, destroyed by Israel in September 2007, had been a nuclear reactor"; "By the end of October 2007, large scale clearing and levelling operations had taken place". Para. 5: June 2008 environmental samples "contained particles of anthropogenic natural uranium, graphite and stainless steel". Para. 13: "Based on commercial imagery from 2001 to 2007, the dimensions of the building are comparable" to the Yongbyon 25 MW(th) reactor; a Member State's photograph showed added wall and roof sections to conceal it. Conclusion: "the destroyed building was very likely a nuclear reactor and should have been declared".
- Bears on: years undetected by the inspectorate (about 2001 to 2007), detection by national intelligence, and environmental sampling and imagery as corroborating channels after the fact.
iaea-gov-2003-40
- Title: Implementation of the NPT Safeguards Agreement in the Islamic Republic of Iran (GOV/2003/40).
- Organisation: IAEA. Year: 2003 (June).
- Identifier: https://www.iaea.org/sites/default/files/gov2003-40.pdf
- Opened: 2026-11-27.
- What it says: Para. 3: in September 2002 the Director General asked Iran to confirm "whether it was building a large underground nuclear related facility at Natanz and a heavy water production plant at Arak, as reported in the media in August 2002."
- Bears on: the detecting channel for Natanz: public media reports, not the inspectorate.
iaea-gov-2003-75
- Title: Implementation of the NPT Safeguards Agreement in the Islamic Republic of Iran (GOV/2003/75).
- Organisation: IAEA. Year: 2003 (10 November 2003).
- Identifier: https://www.iaea.org/sites/default/files/gov2003-75.pdf
- Opened: 2026-11-27.
- What it says: Para. 46: "Iran has now acknowledged that it has been developing, for 18 years, a uranium centrifuge enrichment programme, and, for 12 years, a laser enrichment programme." Para. 47: the decision "had actually been taken in 1985", drawings received "around 1987"; phases 1985-1997, 1997-2002 at the Kalaye Electric Company, 2002 on at Natanz. The report deals with HEU and LEU particles found by sampling at Kalaye and Natanz.
- Bears on: years undetected (1985 to 2002); environmental sampling as the channel that then contradicted Iran's account.
iaea-gov-2009-74
- Title: Implementation of the NPT Safeguards Agreement and relevant provisions of Security Council resolutions in the Islamic Republic of Iran (GOV/2009/74).
- Organisation: IAEA. Year: 2009 (16 November 2009).
- Identifier: https://www.iaea.org/sites/default/files/gov2009-74.pdf
- Opened: 2026-11-27.
- What it says: Para. 7: by letter of 21 September 2009 Iran said it "has decided to construct a new pilot fuel enrichment plant". Para. 12: Iran said the site was allocated "in the second half of 2007". Para. 13: the Agency "had acquired commercially available satellite imagery of the site indicating that there had been construction at the site between 2002 and 2004, and that construction activities were resumed in 2006"; Member States gave "extensive information ... detailing the design" and alleged "design work on the facility had started in 2006". Para. 14: late notification "was inconsistent with its obligations".
- Bears on: years undeclared (2002 or 2006 to 2009); channels (Member State intelligence first, commercial imagery corroborating); the State declared only when it expected exposure.
whitehouse-2009-qom
- Title: Statements by President Obama, President Sarkozy and Prime Minister Brown on Iranian Nuclear Facility.
- Organisation: The White House (archived). Year: 2009 (25 September 2009, Pittsburgh).
- Identifier: https://obamawhitehouse.archives.gov/video/Obama-Sarkozy-and-Brown-on-Iranian-Nuclear-Facility/index__q_page=70.html
- Opened: 2026-11-27.
- What it says: Iran "has been building a covert uranium enrichment facility near Qom for several years"; the three states "presented detailed evidence to the IAEA"; "Earlier this week, the Iranian government presented a letter to the IAEA that made reference to a new enrichment facility."
- Bears on: intelligence as the detecting channel for Fordow.
reuters-2025-iran
- Title: Verifying Iran's enriched uranium stock is 'long overdue', IAEA report says.
- Author: Francois Murphy, Reuters (republished by ThePrint). Year: 2025 (12 November).
- Identifier: https://theprint.in/world/verifying-irans-enriched-uranium-stock-is-long-overdue-iaea-report-says/2782711/
- Opened: 2026-11-27.
- What it says: Pre-strike IAEA estimate of 440.9 kg of uranium enriched up to 60% as UF6, "enough in principle, if further enriched, for 10 nuclear bombs" by an IAEA yardstick. IAEA guidelines call for verifying HEU stocks every month; no access for five months; the IAEA has lost continuity of knowledge.
- Bears on: D4: the timeliness goal is met only while access lasts; after military action and loss of access, the gap grew to many times the goal.
aljazeera-2026-iran
- Title: IAEA urges Iran to allow inspections, points at Isfahan.
- Author: Al Jazeera staff and AFP. Year: 2026 (27 February).
- Identifier: https://www.aljazeera.com/news/2026/2/27/iaea-eyes-isfahan-nuclear-complex-as-it-urges-iran-to-allow
- Opened: 2026-11-27.
- What it says: The stockpile was "last seen by nuclear watchdog inspectors last June 10" (2025); "more than 400kg" of 60% uranium; Iran "restricted the watchdog's inspectors from accessing sites bombed by Israel and the United States"; the IAEA lacks access to Isfahan and does not know the location or status of a fourth enrichment facility.
- Bears on: loss of the inspection channel as a failure mode; about 8.5 months without verification at the report date (my arithmetic from 10 June 2025 to 27 February 2026).
iaea-gc37-1084
- Title: Implementation of the Agreement between the Agency and the Democratic People's Republic of Korea for the Application of Safeguards (GC(XXXVII)/1084).
- Organisation: IAEA, Report by the Director General. Year: 1993 (26 September 1993).
- Identifier: https://iaea.org/sites/default/files/gc/gc37-1084_en.pdf
- Opened: 2026-11-27.
- What it says: Safeguards agreement in force 10 April 1992; Initial Report 4 May 1992; ad hoc inspections from May 1992. Para. 3: "because of the significant inconsistencies between the DPRK's declarations and the Secretariat's findings, the Secretariat was not able to confirm the correctness and completeness". Para. 4: on 9 February 1993 the Director General requested access to "two locations where the Agency had reason to believe there exists nuclear waste"; refused. Para. 6: on 12 March 1993 the DPRK declared "its decision to withdraw from the Treaty". On 1 April 1993 the Board found non-compliance and reported to the Security Council; Resolution 825 on 11 May 1993.
- Bears on: the accountancy and sampling channel works on declared material within months; the response chain (special inspection, Board, Security Council) then fails; withdrawal as the escape (the memo's withdrawal-notice item).
iaea-gov-2004-12
- Title: Implementation of the NPT Safeguards Agreement of the Socialist People's Libyan Arab Jamahiriya (GOV/2004/12).
- Organisation: IAEA. Year: 2004 (20 February 2004).
- Identifier: https://securitycouncilreport.org/atf/cf/%7B65BFCF9B-6D27-4E9C-8CD3-CF6E4FF96FF9%7D/Disarm%20GOV200412.pdf (copy of the derestricted report).
- Opened: 2026-11-27.
- What it says: Para. 4: on 19 December 2003 Libya announced its decision "to eliminate ... materials, equipments and programmes which lead to the production of internationally proscribed weapons." Para. 10: "twelve different sites had been involved in its undeclared nuclear programme since the beginning of the 1980s", including conversion and enrichment it "had failed to report". Para. 22-25: July 1995 decision to reinvigorate; 1997 delivery of 20 pre-assembled L-1 centrifuges and parts for 200 more; an order for 5,000, later 10,000, centrifuges of a second type; Libya also "had obtained nuclear weapon design and fabrication documents".
- Bears on: years undetected (early 1980s to 2003); the inspectorate learned of the programme from the State after the fact.
crs-2004-libya
- Title: Disarming Libya: Weapons of Mass Destruction (RS21823).
- Authors: Sharon A. Squassoni, Andrew Feickert, Congressional Research Service. Year: 2004 (22 April).
- Identifier: https://www.everycrsreport.com/files/20040422_RS21823_9c2b81fe3a3385f6aa0d78a8ac41e3e8cd0cb7ad.html
- Opened: 2026-11-27.
- What it says: Libyan officials "approached British officials in March 2003 with an offer to give up their WMD programs"; US and UK officials first inspected sites in October 2003, which coincided with "the interdiction in the Italian port of Taranto of a shipment ultimately bound for Libya" of centrifuge equipment; early visits revealed "more extensive Libyan nuclear activities than previously thought"; the A.Q. Khan network supplied centrifuges and a weapons design.
- Bears on: the supply-chain and interdiction channel (the AI analogue is chip and equipment export tracking), and disclosure under pressure as the end of a secret programme.
newstart-protocol
- Title: Protocol to the Treaty between the United States of America and the Russian Federation on Measures for the Further Reduction and Limitation of Strategic Offensive Arms (New START).
- Organisation: United States and Russian Federation (treaty text). Year: 2010.
- Identifier: https://courses.physics.illinois.edu/phys280/sp2014/archive/2010%20New%20START%20Protocol.pdf (copy of the signed Protocol).
- Opened: 2026-11-27.
- What it says: Part Five Section VI para. 2: each Party may conduct "no more than ten Type One inspections each year, with no more than two facilities being inspected twice each year". Section VII para. 2: "no more than eight Type Two inspections each year". Pre-inspection restrictions apply "No later than one hour after the time for the designation of the inspection site". Part Four: data updated by notification "no later than 30 days after the expiration of each six-month period"; each change in data notified "no later than five days after it occurs"; notice of an inspection "no less than 32 hours in advance of the estimated time of arrival ... at the point of entry"; site designated "no later than four hours after arrival". Part Seven: exchange of telemetric information.
- Bears on: the declarations-plus-inspection channel with a fixed annual quota; the memo's inspections-per-year placeholder.
fas-2026-newstart
- Title: The Aftermath: The Expiration of New START and What It Means For Us All.
- Authors: Matt Korda, Eliana Johns, Mackenzie Knight-Boyle, Hans Kristensen, Federation of American Scientists. Year: 2026 (5 February).
- Identifier: https://fas.org/publication/the-expiration-of-new-start/
- Opened: 2026-11-27.
- What it says: In early 2023 "Russia halted its exchanges of data, notifications, and telemetry information", and the US took "reciprocal countermeasures". Limits were 1,550 deployed warheads and 700 launchers. Russia "may have exceeded the deployed warhead limit by a small number during portions of 2024", an assessment based on national technical means. Russia's September 2025 offer to observe the central limits for a year was without verification.
- Bears on: the failure analysis: a mature verification regime was suspended by one party three years before expiry, leaving national technical means only.
aca-2026-newstart
- Title: New START Expires As U.S. Urges 'Modernized' Treaty.
- Author: Xiaodon Liang, Arms Control Today. Year: 2026 (March).
- Identifier: https://www.armscontrol.org/act/2026-03/news/new-start-expires-us-urges-modernized-treaty
- Opened: 2026-11-27.
- What it says: The treaty "expired Feb. 5 without a U.S. response to a Russian offer" to keep its central limits informally; the parties now have "no legally binding curbs".
- Bears on: date of the lapse.
nrc-2012-ctbt
- Title: The Comprehensive Nuclear Test Ban Treaty: Technical Issues for the United States.
- Organisation: National Research Council, National Academies Press. Year: 2012.
- Identifier: DOI 10.17226/12849; chapter 2 read at https://www.nationalacademies.org/read/12849/chapter/5
- Opened: 2026-11-27.
- What it says: Planned IMS: 50 primary seismic, 120 auxiliary seismic, 80 radionuclide, 11 hydroacoustic and 60 infrasound stations (p. 39). Finding 2-5 (p. 51): "The threshold levels for IMS seismic detection are now well below 1 kt worldwide for fully coupled explosions." Table 2-2 (p. 51), 90% confidence: worldwide mb 3.8, 0.22 kt (better propagation) or 0.56 kt (poorer); Asia, Europe and North Africa mb 3.4, 0.09 kt or 0.22 kt. Regional monitoring "~ 20 tons or 0.020 kilotons", global "~ 200 tons", test-site "about 5 tons" (pp. 44-45). Finding 2-13 (p. 62): in-water threshold "10 tons (0.01 kt) or below worldwide". Radionuclide: a 1 kt atmospheric test is detected with "approximately 97 percent" global average probability (Fig. 2-9); a 1 kt underground test about 88% with 39 noble gas stations, near 97% with the full network (Fig. 2-10); Finding 2-12: xenon detectable "In at least 50 percent of underground nuclear-explosion tests near 1 kt or larger". Box 2-3: DPRK 2006, mb 4.1, 22 stations (14 primary, 8 auxiliary), Xe-133 at Yellowknife about 14 days later, yield "less than a kiloton"; 2009, mb 4.5, 61 stations. On-site inspection: up to 1,000 km2, 60 days plus 70; Finding 2-22: "high likelihood of detecting evidence of a nuclear explosion with yield greater than about 0.1 kilotons" if located in advance and unhindered. Infrasound: 1 kt detected over 80% of Earth's surface with 42 stations. Finding 2-16: integrating infrasound with seismic "will provide better detection, location, and identification".
- Bears on: the multi-channel guarantee: the IMS is the clearest case of independent physical channels observing the same event, where combining detection probabilities is justified; it works because the event is energetic, which for AI holds only for large concentrated compute.
ctbto-artxiv-2025
- Title: Background document by the Provisional Technical Secretariat prepared for the Conference on Facilitating the Entry into Force of the CTBT (CTBT-Art.XIV/2025/3).
- Organisation: CTBTO Preparatory Commission. Year: 2025 (19 August).
- Identifier: https://www.ctbto.org/sites/default/files/2025-09/CTBT-Art.XIV-2025-3.pdf
- Opened: 2026-11-27.
- What it says: Para. 12: the IMS "is to consist of a network of 321 monitoring stations and 16 radionuclide laboratories." Para. 13: "As of 30 June 2025, 301 (94%) IMS stations had been installed, of which 292 had been officially certified"; of 40 noble gas systems, "32 had been installed, of which 26 systems have been certified (65%)". Entry into force needs all 44 Annex 2 States; the treaty has 178 ratifications, including 35 of the 44.
- Bears on: a verification network built and run for decades before (and without) entry into force: monitoring can precede a treaty.
baker-2023
- Title: Nuclear Arms Control Verification and Lessons for AI Treaties.
- Author: Mauricio Baker. Year: 2023.
- Identifier: arXiv 2304.04123.
- Opened: 2026-11-27.
- What it says: The IAEA "has explicitly decided to make this tradeoff such that its detection probability is 90-95% for the most sensitive nuclear material" (fn. 50). SQ critics say weapons could be made with less "by a factor of e.g., 2-8" (fn. 53). Section 4: "the strongest widely implemented M&V system has had zero known major failures"; "no state has attempted to divert a significant quantity of nuclear material from a facility that was under CSA safeguards"; APs "are nearly untested in their ability to detect secret nuclear weapons development activities". Appendix E: "the IAEA identifies suspect locations mainly through voluntary tips from national intelligence agencies"; these tips "appear to be irreplaceable". For AI chips: for 90% detection of serious violations, "58,000 to 580,000 chips would have to be examined annually", and 2x chip growth needs 2x examinations to keep 90%.
- Bears on: the multi-channel guarantee (per-layer 90% detection as a design target; channel dependence on intelligence); the track record. Note the record of "zero known major failures" is for CSA plus AP; the misses in this note were under CSAs without APs or outside safeguards.
shavit-2023
- Title: What does it take to catch a Chinchilla? Verifying Rules on Large-Scale Neural Network Training via Compute Monitoring.
- Author: Yonadav Shavit. Year: 2023.
- Identifier: arXiv 2303.11341.
- Opened: 2026-11-27.
- What it says: Chip sampling with on-chip weight snapshots; the number of chips sampled per monitoring period s >= log(1 - p) / log(1 - aH/(C)(1 - e^(-f Tm))) x Tm/T (Eq. 1). Table 1: annual samples "to catch a chip from every large-scale training run within T = 30 days" at "probability of catching a rule-violating training run p = 0.9". Footnote 5: catching a 10^25 FLOP run within 30 days of completion anywhere, with 90% probability, among 10^7 chips, "would require roughly 232,000 worldwide chip samples per year", about 232 inspectors, "slightly smaller than the 280 active IAEA inspectors as of 2021." As algorithmic efficiency rises "the number of required samples would need to grow".
- Bears on: the closest AI analogue of an IAEA timeliness goal plus detection probability (30 days, 90%); D4 (but Shavit's 30 days is a detection target, not tied to breakout time).
wasil-2024
- Title: Verification methods for international AI agreements.
- Authors: Akash R. Wasil, Tom Reed, Jack William Miller, Peter Barnett. Year: 2024.
- Identifier: arXiv 2408.16074 (v2).
- Opened: 2026-11-27.
- What it says: Ten methods in three groups: national technical means (remote sensing, whistleblowers, energy monitoring, customs data, financial intelligence); access-dependent (data centre, fab and developer inspections); hardware-dependent (chip location tracking and others). "national technical means are limited in their ability to identify software-level violations or concerted attempts at concealment"; adversaries could disguise data centres "as other high-energy facilities like power plants, or when compute is distributed across multiple smaller sites". Table 1 maps each method's gaps to complementary methods. No detection rates or timeliness.
- Bears on: the channel list for the protocol; prior art for multiple channels, without a quantified combined guarantee.
ho-2023
- Title: International Institutions for Advanced AI.
- Authors: Lewis Ho, Joslyn Barnhart, Robert Trager, Yoshua Bengio, Miles Brundage, Allison Carnegie, Rumman Chowdhury, Allan Dafoe, Gillian Hadfield, Margaret Levi, Duncan Snidal. Year: 2023.
- Identifier: arXiv 2307.04699.
- Opened: 2026-11-27.
- What it says: Four models: "a Commission on Frontier AI", "an Advanced AI Governance Organization that sets international standards ... and possibly monitors compliance", "a Frontier AI Collaborative", "an AI Safety Project". Some observers ask whether oversight might need "detection and inspections of large data centers (partly analogous to IAEA safeguards)". "negotiating verification is always fraught (e.g., in the case of the Chemical Weapons Convention) and often unsuccessful (e.g., in the case of the Biological Weapons Convention)".
- Bears on: institutional design; no timeliness or detection-rate analysis.
scher-2025-agreement
- Title: An International Agreement to Prevent the Premature Creation of Artificial Superintelligence.
- Authors: Aaron Scher, David Abecassis, Peter Barnett, Brian Abeyta (MIRI Technical Governance Team). Year: 2025.
- Identifier: arXiv 2511.10783 (v2, 17 November 2025).
- Opened: 2026-11-27.
- What it says: Training above the "Strict Threshold (i.e., 10^24 FLOP)" prohibited; above the "Monitored Threshold (i.e., 10^22 FLOP)" approved and monitored; clusters above "16 H100-equivalents" must sit in monitored facilities. "an ASI breakout by anyone, anywhere, cannot be allowed to happen even once." Breakout time is "the time it takes between when a group starts trying to create a superintelligence and the point at which they succeed"; destroying chips would increase it, but "because we think it's feasible to track chips and verify their usage, we do not think that the benefit of longer breakout times is clearly worth the cost". Consolidation limits "breakout potential". Challenge inspections "modeled after" the CWC. Withdrawal with notice "12 months in advance". Precedent: "The CWC requires the declaration and inspection of all Chemical Weapons Production Facilities - there have been 97 declared".
- Bears on: D3 (breakout time used qualitatively, not computed), D4 (a FLOP line rather than a time line), challenge inspections, withdrawal notice. Closest prior art for the protocol's shape.
scher-thiergart-2025
- Title: Mechanisms to Verify International Agreements About AI Development.
- Authors: Aaron Scher, Lisa Thiergart (MIRI Technical Governance Team). Year: 2025 (arXiv June 2025; PDF dated November 2024).
- Identifier: arXiv 2506.15867.
- Opened: 2026-11-27.
- What it says: Verification mechanisms are "processes or tools that give one party greater confidence that another is following the agreed-upon rules, typically by detecting violations"; "increased access (e.g., physical inspections of data centers) can often substitute for these technical approaches." Feasibility estimates are given with "low confidence". I found no detection probabilities or timeliness targets in a text search.
- Bears on: channel catalogue; no quantified guarantee.
baker-2025-six-layers
- Title: Verifying International Agreements on AI: Six Layers of Verification for Rules on Large-Scale AI Development and Deployment.
- Authors: Mauricio Baker, Gabriel Kulp, Oliver Marks, Miles Brundage, Lennart Heim. Year: 2025.
- Identifier: arXiv 2507.15916 (v2).
- Opened: 2026-11-27.
- What it says: "six largely independent verification approaches with substantial redundancy: (1) built-in security features in AI chips; (2-3) separate monitoring devices attached to AI chips; and (4-6) personnel-based mechanisms, such as whistleblower programs" (interviews and national intelligence are the other two). Footnote 33: "a verification regime's probability of detecting a violation is approximately that of the subgoal with the lowest probability of detecting a violation. This is because a Prover only needs to circumvent one verification subgoal", ignoring aggregation of small violations "depending on the detection probabilities and their correlation". On- and off-chip layers "will likely be circumventable until there is substantial progress on the R&D".
- Bears on: the multi-channel guarantee: directly contradicts multiplying miss probabilities across channels that watch different paths. Prior art for layered redundancy.
hendrycks-2025
- Title: Superintelligence Strategy: Expert Version.
- Authors: Dan Hendrycks, Eric Schmidt, Alexandr Wang. Year: 2025.
- Identifier: arXiv 2503.05628 (v2).
- Opened: 2026-11-27.
- What it says: Mutual Assured AI Malfunction: "a deterrence regime resembling nuclear mutual assured destruction (MAD) where any state's aggressive bid for unilateral AI dominance is met with preventive sabotage by rivals." "Even if an intelligence recursion achieves only a tenfold speedup overall, we could condense a decade of AI development into a year." On a moratorium: "the absence of verification mechanisms means the treaty would be toothless".
- Bears on: D4's logic as deterrence by detection and sabotage (response is sabotage, not a legal process); D2 and D3 (recursion compresses breakout time).
gan-2026-clock
- Title: Agreements Have a Clock: Compute Growth and the Verification of AI Restraint.
- Author: Li Gan (Texas A&M University). Year: 2026 (3 November 2026).
- Identifier: arXiv 2611.04272.
- Opened: 2026-11-27.
- What it says: Eq. (12): restarting with a positive gap requires "min{D + l, R(d)} < Tcatch(d; ...)", where D is detection delay, l implementation delay, R the remaining pause and Tcatch the follower's time to reach the frozen frontier. "Compute keeps growing during a compliant pause, so a fixed capability gap does not preserve a fixed catch-up time": 12 months at the start, 8.61 after 12 months, 5.74 after 24. "A fixed response standard fails as catch-up time falls." Detection is Poisson: caught within the window with probability 1 - e^(-m w). Proposition 4: cooperation holds iff max xi_i/w_i <= min (C_i - R_i)/eta_i. "Deterrence does not require near-certain detection": in the calibration, about 32 percent detection within the window suffices, and "at the threshold a breakout still succeeds with probability ... 68 percent"; holding success below beta "needs m >= ln(1/beta)/w". Critical window 6.89 months; cooperation supportable "through month 18.9", 25.5 with matched safety research, 31.8 with half the monitoring cost. It cites Baker (2023), Avenhaus and Canty (1996) on "the timeliness of inspection", and a 1989 START verification paper distinguishing information, significance and "timely countermeasures".
- Bears on: D3 and D4: the closest prior art found. It states D4's inequality (response time below breakout time), computes breakout time from a calibrated model, and shows it shrinks as compute grows. It separates deterrence (incentive) from prevention (tolerated breakout probability), a distinction D4 needs.
barnett-scher-2025
- Title: AI Governance to Avoid Extinction: The Strategic Landscape and Actionable Research Questions.
- Authors: Peter Barnett, Aaron Scher (MIRI Technical Governance Team). Year: 2025 (May).
- Identifier: arXiv 2505.04592.
- Opened: 2026-11-27.
- What it says: On a "Threat of Sabotage" regime: "nations must be able to detect and respond to dangerous AI development faster than any single country's breakout time - the time needed to secretly advance beyond permitted levels of AI capabilities." Countries could "extend breakout times by reducing their AI capabilities and infrastructure". Glossary: "Breakout time The time it would take a country to develop dangerous AI capabilities or do certain AI activities, likely in violation of agreements or monitoring." Research questions: "What is the breakout time for doing secret AI chip development", for "states building covert AI data centers", and "How do we push back breakout time ... How long does breakout time need to be?"; with automated AI R&D "breakout times may be very short, even given limited compute."
- Bears on: D3 and D4: the inequality and the definition are stated here, qualitatively, as open research questions.
sastry-2024
- Title: Computing Power and the Governance of Artificial Intelligence.
- Authors: Girish Sastry, Lennart Heim, Haydn Belfield, Markus Anderljung, Miles Brundage, Julian Hazell, Cullen O'Keefe, Gillian K. Hadfield, Richard Ngo, Konstantin Pilz, George Gor and others. Year: 2024.
- Identifier: arXiv 2402.08797.
- Opened: 2026-11-27.
- What it says: "AI Training is Similar to Uranium Enrichment" (Fig. 15). "Enrichment capacity has been a key focus of nuclear nonproliferation regimes, as it is the key determinant of 'breakout time': the minimum time for a state to produce enough weapons-grade enriched uranium fuel for a single nuclear weapon." Limits: "The nonradioactivity of compute makes it more difficult to detect at ports and other border crossings"; "no obvious parallels in nuclear proliferation to the release of model weights"; some compute supply-chain steps "have only a single company" versus 6 to 59 manufacturers per NSG good.
- Bears on: D3 (the enrichment-to-training analogy and breakout time), O3 chokepoints.
avenhaus-2002
- Title: Inspection Games. In: Handbook of Game Theory with Economic Applications, vol. 3, ch. 51, pp. 1947-1987.
- Authors: Rudolf Avenhaus, Bernhard von Stengel, Shmuel Zamir. Year: 2002.
- Identifier: DOI 10.1016/S1574-0005(02)03014-X; abstract opened at https://ideas.repec.org/h/eee/gamchp/3-51.html (full text not opened; paywalled).
- Opened: 2026-11-27 (abstract only).
- What it says (abstract): the field began with "the analysis of arms control and disarmament problems in the sixties"; inspection extends hypothesis testing and is a game because "the data can be strategically manipulated by an inspectee who wants to conceal illegal actions"; material accountancy and data verification models are solved; "inspection resources are limited and have to be used strategically"; "the inspector becomes a leader by announcing and committing himself to his strategy."
- Bears on: the memo's defection item (inspection games are prior work); detection probability and false-alarm trade-offs.
allen-2015-llnl
- Title: Systems Approach to Arms Control Verification (LLNL-CONF-671180), ESARDA Symposium 2015.
- Authors: K. Allen, I. Neimeyer (as spelled on the paper), C. Listner, G. Stein, C. Chen, M. Dreicer (LLNL and Forschungszentrum Juelich). Year: 2015.
- Identifier: https://www.osti.gov/servlets/purl/1184177
- Opened: 2026-11-27.
- What it says: Applies acquisition path analysis from the IAEA State-level concept to a hypothetical arms-cap treaty. Path attributes include "Proliferation Time - The minimum time required to deploy a strategically significant quantity of additional weapons" and detection probability; "cumulative detection probabilities cannot be determined in advance" when no measures are agreed, but path analysis "can be used to identify where specific verification measures might be of most benefit."
- Bears on: the multi-channel guarantee and the pathway ranking: rank paths by time and by detection probability, then place measures; prior art for D3 per pathway.
allison-herzog-2025
- Title: Artificial Intelligence and Nuclear Weapons Proliferation: The Technological Arms Race for (In)visibility.
- Authors: David M. Allison, Stephen Herzog. Year: 2025 (Risk Analysis).
- Identifier: DOI 10.1111/risa.70105; arXiv 2512.07487.
- Opened: 2026-11-27.
- What it says: A model of proliferation-enabling against detection-enhancing technologies, with a hazard rate of "clandestine breakout attempts"; it sets a parameter "to match IAEA safeguards modeling standards, which target a ~90% detection probability for significant material diversions" (model section, kappa = 0.4). The abstract says AI's scaling "challenge[s] traditional monitoring and verification methods".
- Bears on: found in the D4 prior-art search; about AI's effect on nuclear detection, not an AI trigger, so not prior art for D4.
ansari-2026
- Title: Hardware-Level Governance of AI Compute: A Feasibility Taxonomy for Regulatory Compliance and Treaty Verification.
- Author: Samar Ansari (University of Chester). Year: 2026.
- Identifier: arXiv 2604.04712.
- Opened: 2026-11-27.
- What it says: An engineering taxonomy of hardware governance mechanisms; the IAEA analogy is "instructive but imperfect" because the IAEA works with State consent. A text search found no breakout-time or timeliness analysis.
- Bears on: found in the D4 prior-art search; not prior art for D4.
alramiah-2025
- Title: Toward a Global Regime for Compute Governance: Building the Pause Button.
- Authors: Ananthi Al Ramiah, Raymond Koopmanschap, Josh Thorsteinson, Sadruddin Khan, Jim Zhou, Shafira Noh, Joep Meindertsma, Farhan Shafiq. Year: 2025.
- Identifier: arXiv 2506.20530.
- Opened: 2026-11-27.
- What it says: Proposes a compute-governance regime with a pause mechanism and draws on IAEA history ("uncovering Iran's undeclared enrichment facilities"). A text search found no breakout time or timeliness logic.
- Bears on: found in the D4 prior-art search; not prior art for D4.
Numbers for the ledger
| id | value | unit | kind | source key | where |
|---|---|---|---|---|---|
| sq-plutonium | 8 | kg Pu | spec | iaea-glossary-2022 | 3.19, Table 1 |
| sq-u233 | 8 | kg U-233 | spec | iaea-glossary-2022 | Table 1 |
| sq-heu | 25 | kg U-235 in HEU | spec | iaea-glossary-2022 | Table 1 |
| sq-leu | 75 | kg U-235 (or 10 t natural U, 20 t depleted U) | spec | iaea-glossary-2022 | Table 1 |
| sq-thorium | 20 | t | spec | iaea-glossary-2022 | Table 1 |
| sq-critique-factor | about 8 | ratio (proposed reduction of Pu and HEU SQs) | assumption | cochran-2005 | Section III |
| conversion-time-metal | 7 to 10 | days | spec | iaea-glossary-2022 | 3.20, Table 2 |
| conversion-time-pure-compounds | 1 to 3 | weeks | spec | iaea-glossary-2022 | Table 2 |
| conversion-time-irradiated | 1 to 3 | months | spec | iaea-glossary-2022 | Table 2 |
| conversion-time-leu-thorium | 3 to 12 | months | spec | iaea-glossary-2022 | Table 2 |
| timeliness-goal-unirradiated-direct | 1 | month | spec | iaea-glossary-2001 | 3.20 |
| timeliness-goal-irradiated-direct | 3 | months | spec | iaea-glossary-2001 | 3.20 |
| timeliness-goal-indirect | 12 | months | spec | iaea-glossary-2001 | 3.20 |
| nuclear-margin-metal | 7-10 days over 1 month, about 0.23 to 0.33 | ratio conversion time / timeliness goal | design (derived here) | iaea-glossary-2001 | 3.13, 3.20 |
| detection-prob-high | 0.9 | probability | spec | iaea-glossary-2022 | 9.32 (also 2001, 3.16) |
| detection-prob-medium | 0.5 | probability | spec | iaea-glossary-2022 | 9.32 |
| detection-prob-low | 0.2 | probability | spec | iaea-glossary-2022 | 9.32 |
| detection-prob-most-sensitive | 0.90 to 0.95 | probability | spec | baker-2023 | fn. 50 |
| false-alarm-prob | 0.01 (2022 example); 0.05 or less (2001) | probability | spec | iaea-glossary-2022 | 9.22, 9.31; 2001 3.17 |
| muf-test-interval | 2 or 3 | sigma_MUF | spec | iaea-glossary-2022 | 9.21 |
| routine-inspection-small-facility | 1 | per year (facilities under 5 ekg) | spec | iaea-glossary-2022 | 10.17, 10.26 |
| mrie-reactor | 50 | person-days per year | spec | iaea-glossary-2022 | 10.26 |
| mrie-pu-heu-floor | 450 | person-days per year | spec | iaea-glossary-2022 | 10.26 |
| ap-ca-notice | 24 | hours | spec | infcirc-540 | Art. 4.b(i) |
| ap-ca-notice-on-site | 2 | hours | spec | infcirc-540 | Art. 4.b(ii) |
| sg-states-2024 | 190 | States | measured | iaea-sir-2024 | Statement A |
| sg-states-csa-ap-2024 | 137 | States | measured | iaea-sir-2024 | A.1 |
| sg-states-broader-conclusion-2024 | 75 | States | measured | iaea-sir-2024 | A.1(a) |
| iran-heu60-sq-end2024 | 3.9 | SQ | measured | iaea-sir-2024 | B.2 |
| iran-heu60-kg-prewar | 440.9 | kg U enriched up to 60% | measured | reuters-2025-iran | body |
| iran-heu60-weapons-yardstick | 10 | weapons if further enriched | spec | reuters-2025-iran | body |
| iran-heu-verify-guideline | 1 | month | spec | reuters-2025-iran | body |
| iran-heu-last-verified | 2025-06-10 | date | measured | aljazeera-2026-iran | body |
| iran-months-unverified-feb2026 | about 8.5 | months | measured (derived here) | aljazeera-2026-iran | 10 Jun 2025 to 27 Feb 2026 |
| cwc-ci-notice | 12 | hours (minimum, before arrival at point of entry) | spec | cwc-text | Art. IX para. 15 |
| cwc-ci-ec-block | 3/4 of all members within 12 hours | vote | spec | cwc-text | Art. IX para. 17 |
| cwc-ci-final-perimeter | 24 | hours after arrival | spec | cwc-text | Part X para. 14, 16 |
| cwc-ci-transport-max | 36 | hours after arrival | spec | cwc-text | Part X para. 14 |
| cwc-ci-exit-monitoring | 12 | hours after arrival | spec | cwc-text | Part X para. 23 |
| cwc-ci-duration-max | 84 | hours | spec | cwc-text | Part X para. 57 |
| cwc-ci-prelim-report | 72 | hours after return | spec | cwc-text | Part X para. 60 |
| cwc-ci-draft-final-report | 20 | days | spec | cwc-text | Part X para. 61 |
| cwc-ci-requested-since-1997 | 0 | requests (1997 to July 2025) | measured | opcw-ec109-dg22 | para. 5 |
| opcw-cw-inspections | 3,521 | inspections since 1997 (sum of CW categories) | measured | opcw-numbers | Destruction progress |
| opcw-industry-inspections | 5,128 | inspections since 1997 (sum of industry categories) | measured | opcw-numbers | Industry verification |
| opcw-stockpile-destroyed | 72,304.34 of 72,305 | t | measured | opcw-numbers | Destruction progress |
| opcw-cwpf-declared | 98 | facilities | measured | opcw-numbers | CWPF |
| bwc-verification-staff-proposed | 6 | additional ISU staff | design | littlewood-lentzos-2024 | body |
| bwc-wg-days | 60 | meeting days over 4 years | spec | littlewood-lentzos-2024 | body |
| newstart-type1-quota | 10 | inspections per year | spec | newstart-protocol | Part Five Sec. VI para. 2 |
| newstart-type2-quota | 8 | inspections per year | spec | newstart-protocol | Part Five Sec. VII para. 2 |
| newstart-data-update | 6 | months (plus 30 days to notify) | spec | newstart-protocol | Part Four |
| newstart-change-notice | 5 | days | spec | newstart-protocol | Part Four |
| newstart-inspection-notice | 32 | hours (minimum) | spec | newstart-protocol | Part Four Sec. VI para. 9 |
| newstart-site-designation | 4 | hours after arrival | spec | newstart-protocol | Part Four Sec. VI para. 14(a) |
| newstart-warhead-limit | 1,550 | deployed warheads | spec | fas-2026-newstart | body |
| newstart-launcher-limit | 700 | deployed launchers | spec | fas-2026-newstart | body |
| newstart-expiry | 2026-02-05 | date | measured | aca-2026-newstart | body |
| ctbt-ims-stations-planned | 321 | stations (+16 labs) | spec | ctbto-artxiv-2025 | para. 12 |
| ctbt-ims-installed-2025 | 301 | stations (30 Jun 2025) | measured | ctbto-artxiv-2025 | para. 13 |
| ctbt-ims-certified-2025 | 292 | stations (30 Jun 2025) | measured | ctbto-artxiv-2025 | para. 13 |
| ctbt-noble-gas-certified-2025 | 26 of 40 | systems | measured | ctbto-artxiv-2025 | para. 13 |
| ctbt-seismic-90pct-world-good | 0.22 | kt (mb 3.8) | measured | nrc-2012-ctbt | Table 2-2 |
| ctbt-seismic-90pct-world-poor | 0.56 | kt | measured | nrc-2012-ctbt | Table 2-2 |
| ctbt-seismic-90pct-eurasia | 0.09 to 0.22 | kt (mb 3.4) | measured | nrc-2012-ctbt | Table 2-2 |
| ctbt-seismic-regional | 0.02 | kt | measured | nrc-2012-ctbt | Fig. 2-7 |
| ctbt-hydroacoustic | 0.01 | kt or below | measured | nrc-2012-ctbt | Finding 2-13 |
| ctbt-radionuclide-atm-1kt | 0.97 | probability within 14 days | measured | nrc-2012-ctbt | Fig. 2-9 |
| ctbt-radionuclide-ug-1kt | 0.88 (39 stations), about 0.97 (full) | probability | measured | nrc-2012-ctbt | Fig. 2-10 |
| ctbt-osi-area | 1,000 | km2 | spec | nrc-2012-ctbt | pp. 71-73 |
| ctbt-osi-duration | 60 (+70) | days | spec | nrc-2012-ctbt | pp. 71-73 |
| ctbt-osi-min-yield | 0.1 | kt | measured | nrc-2012-ctbt | Finding 2-22 |
| dprk-2006-stations | 22 | IMS stations (mb 4.1, yield under 1 kt) | measured | nrc-2012-ctbt | Box 2-3 |
| dprk-2009-stations | 61 | IMS stations (mb 4.5) | measured | nrc-2012-ctbt | Box 2-3 |
| program-iraq-years-undetected | about 10 | years (late 1981 decision to mid-1991) | measured | albright-2002; thorne-1992 | body |
| program-iraq-channel | intelligence (reconnaissance imagery, tips) driving post-war UN inspections | channel | measured | thorne-1992 | "The role of intelligence information" |
| program-libya-years-undetected | about 20+ | years (beginning of 1980s to Dec 2003) | measured | iaea-gov-2004-12 | para. 10 |
| program-libya-channel | intelligence-led interdiction (Taranto, Oct 2003) and negotiated disclosure | channel | measured | crs-2004-libya | body |
| program-iran-centrifuge-years | 17 | years (1985 to Aug 2002) | measured | iaea-gov-2003-75; iaea-gov-2003-40 | para. 46-47; para. 3 |
| program-iran-natanz-channel | public media reports (Aug 2002), then environmental sampling | channel | measured | iaea-gov-2003-40 | para. 3 |
| program-fordow-years | about 3 (design 2006) to 7 (construction 2002) | years to Sept 2009 | measured | iaea-gov-2009-74 | para. 13 |
| program-fordow-channel | Western intelligence, then commercial imagery | channel | measured | whitehouse-2009-qom; iaea-gov-2009-74 | body; para. 13 |
| program-syria-years | about 6 | years (imagery from 2001 to strike Sept 2007) | measured | iaea-gov-2011-30 | para. 2, 13 |
| program-syria-channel | national intelligence; IAEA informed 2008 after destruction; sampling corroborated | channel | measured | iaea-gov-2011-30 | para. 2, 5 |
| program-dprk-discrepancy-months | about 9 | months (Initial Report 4 May 1992 to special inspection request 9 Feb 1993) | measured | iaea-gc37-1084 | para. 2-4 |
| program-dprk-channel | IAEA accountancy and sampling of declared material | channel | measured | iaea-gc37-1084 | para. 3 |
| program-dprk-withdrawal-days | 31 | days (request 9 Feb to withdrawal notice 12 Mar 1993) | measured | iaea-gc37-1084 | para. 4, 6 |
| program-biopreparat-years | 16 | years (1973 to Oct 1989) | measured | fas-biopreparat; hoffman-2009 | body |
| program-biopreparat-channel | defector (Pasechnik), scale underestimated 10x | channel | measured | fas-biopreparat; hoffman-2009 | body |
| program-southafrica-years-active | 15 | years (1974 to 1989), never detected by the inspectorate while active in these sources | measured | vonbaeckmann-1995 | chronology |
| program-southafrica-channel | self-disclosure (24 Mar 1993) | channel | measured | vonbaeckmann-1995 | chronology |
| program-southafrica-decision-to-device | about 5 | years (1974 to 1979) | measured | vonbaeckmann-1995 | chronology |
| shavit-detect-window | 30 | days after completion | design | shavit-2023 | Table 1 |
| shavit-detect-prob | 0.9 | probability | design | shavit-2023 | Table 1 |
| shavit-samples-1e25 | 232,000 | chip samples per year (10^7 chips) | design | shavit-2023 | fn. 5 |
| iaea-inspectors-2021 | 280 | active inspectors | measured | shavit-2023 | fn. 5 |
| baker-chip-samples-90pct | 58,000 to 580,000 | chips per year | design | baker-2023 | Section on AI chips |
| miri-strict-threshold | 1e24 | FLOP | design | scher-2025-agreement | Art. IV |
| miri-monitored-threshold | 1e22 | FLOP | design | scher-2025-agreement | Art. IV |
| miri-cluster-threshold | 16 | H100-equivalents | design | scher-2025-agreement | Art. II, V |
| miri-withdrawal-notice | 12 | months | design | scher-2025-agreement | Art. XV |
| gan-catchup-start | 12 | months | assumption | gan-2026-clock | Sec. 4.2 |
| gan-catchup-12mo | 8.61 | months | assumption | gan-2026-clock | Sec. 4.2 |
| gan-catchup-24mo | 5.74 | months | assumption | gan-2026-clock | Sec. 4.2 |
| gan-critical-window | 6.89 | months | assumption | gan-2026-clock | Sec. 1 |
| gan-deterrence-detect-prob | 0.32 | probability within window | assumption | gan-2026-clock | Sec. 4.3 |
All Gan values are from an illustrative calibration, hence "assumption". Values marked "derived
here" are my arithmetic on sourced values and should be recomputed in model/subcritical.py
rather than entered as inputs.
Prior art for the memo's candidates
All judgements below are claims about my search, not about the world.
Searches tried (web search, then opening hits; each AI paper also searched in full text for "breakout", "timeliness", "timely", "detection probability"):
"breakout time" artificial intelligence superintelligence detection "timeliness" IAEA analogy compute governance(extended): found gan-2026-clock, barnett-scher-2025, scher-2025-agreement, allison-herzog-2025, ansari-2026. A RAND perspective, "Insights from nuclear history for AI governance" (PEA3652-1), came up but its PDF blocked automated access, so I did not open it.AI governance "timely detection" "significant quantity" compute analog nuclear safeguards training run detection time conversion time(extended): found sastry-2024, alramiah-2025, gan-2026-clock again."Mechanisms to Verify International Agreements About AI Development" MIRI 2025 arXiv: scher-thiergart-2025, baker-2025-six-layers.MIRI technical governance team 2025 "international agreement" prevent premature superintelligence: scher-2025-agreement.acquisition path analysis "detection probability" combined multiple safeguards measures: allen-2015-llnl.- Direct reads of the papers named in the brief: wasil-2024, shavit-2023, ho-2023, baker-2023, hendrycks-2025.
D3, breakout time. Closest: scher-2025-agreement ("the time it takes between when a group starts trying to create a superintelligence and the point at which they succeed"), barnett-scher-2025 (glossary definition and research questions on breakout time for covert chips and data centres), gan-2026-clock (a computed catch-up time from a calibrated takeoff model, falling as compute grows), sastry-2024 (enrichment as the determinant of nuclear breakout, training as its analogue), and the nuclear concepts themselves (conversion time, detection time, acquisition path, iaea-glossary-2022). Judgement: prior work for the concept and for computing it from a model; the memo's version, computed from a party's verified holdings (chips, weights, data, labour) and a measured loop gain D2, is at most extends prior work. Gan already shows the key dynamic the memo lists as a failure (breakout time shrinking at fixed declared position as compute and algorithms improve).
D4, weapons-grade when T_b < m T_r. Closest: barnett-scher-2025 ("nations must be able to detect and respond to dangerous AI development faster than any single country's breakout time"), gan-2026-clock (min{D + l, R} < T_catch, with detection delay and implementation delay separated, and a date-dependent response standard), hendrycks-2025 (MAIM: detect and sabotage before a bid for dominance completes), shavit-2023 (an explicit 30-day, 90% detection target), and the IAEA rule that detection time should correspond to conversion time (iaea-glossary-2001). Judgement: the inequality is prior work. Using it as the classification line between useful AI and weapons-grade, with an explicit margin m and the regime's own guaranteed T_r, and letting everything above the line keep improving, was not found as such in my search, so extends prior work, not new. The memo's label "new as a regulatory trigger" should change. Two corrections from the nuclear record: the nuclear margin is about 1 (below 1 for metal), so m > 1 has no precedent; and nuclear timeliness counts detection only, so T_r as "detect and respond" has no measured precedent. Gan also shows that a line set for deterrence (about 32% detection in the window in his calibration) is far weaker than a line set for prevention (breakout success below a tolerated beta); D4 must say which it is.
Multi-channel guarantee (combined miss probability over the breakout time). Closest: baker-2025-six-layers (six largely independent layers, with the regime's detection probability approximately that of the weakest subgoal), baker-2023 (90% per layer; IAEA dependence on intelligence tips), shavit-2023 (sampling formula for p within a window), gan-2026-clock (Poisson detection 1 - e^(-m w)), wasil-2024 (ten channels and their gaps), allen-2015-llnl and iaea-glossary-2022 (acquisition path analysis with path-level detection probabilities), nrc-2012-ctbt (independent physical channels on the same event). Judgement: the structure is prior work. A sourced per-channel detection rate table feeding a per-path, evader-minimised miss probability over T_b may extend prior work. Evidence against the memo's current form: (a) the product of per-channel miss probabilities applies only when every channel watches the same path and fails independently; across paths the evader takes the weakest (baker-2025-six-layers); (b) channels are correlated (inspections and special inspections follow intelligence: baker-2023 App. E; CWC challenge inspections need a requesting state); (c) the realised detection record for undeclared programmes is years, not the months the placeholders imply.
Challenge inspections on the CWC model. scher-2025-agreement already models its challenge inspections on the CWC. Judgement: prior work. Evidence against the memo: zero requests since 1997 (opcw-ec109-dg22), so the channel's realised rate is 0; the memo should either model a genuinely random inspection (like the IAEA's short-notice random inspections or AP complementary access, iaea-glossary-2022 10.9-10.10, infcirc-540 Art. 4) or price the political trigger.
Threshold quantity (an SQ for AI). scher-2025-agreement (10^22 and 10^24 FLOP; 16 H100-equivalents), shavit-2023 (training run size H). Judgement: prior work. cochran-2005 and baker-2023 warn that nuclear SQs may be too high by 2 to 8 times, the same risk for a compute line as algorithms improve.
Withdrawal notice longer than response time. scher-2025-agreement (12 months). Judgement: prior work. iaea-gc37-1084 shows withdrawal used 31 days after a special inspection request.
Defection and inspection games. avenhaus-2002 (inspector leadership, accountancy games), gan-2026-clock (costed monitoring and voluntary participation). Judgement: prior work.
P4 footprint floor and energy signatures. Not my track, but the record bears on it: inspectors read Tarmiya's "huge electrical load" (thorne-1992), and Iraq buried power lines to hide it (albright-2002); wasil-2024 notes data centres disguised as other high-energy facilities. The floor concept itself was not searched here.
Sources (TOML)
[source.iaea-glossary-2022]
type = "official-docs"
title = "IAEA Safeguards Glossary, 2022 Edition (International Nuclear Verification Series No. 3 (Rev. 1))"
authors = "International Atomic Energy Agency"
year = 2022
isbn = "978-92-0-122222-0"
url = "https://www.bnl.gov/ispo/docs/iaea-sgs-glossary.pdf"
opened = "2026-11-27"
[source.iaea-glossary-2001]
type = "official-docs"
title = "IAEA Safeguards Glossary, 2001 Edition (International Nuclear Verification Series No. 3)"
authors = "International Atomic Energy Agency"
year = 2002
isbn = "92-0-111902-X"
url = "https://www-pub.iaea.org/MTCD/Publications/PDF/NVS3_scr.pdf"
opened = "2026-11-27"
[source.cochran-2005]
type = "report"
title = "Adequacy of IAEA's Safeguards for Achieving Timely Detection (Draft 2)"
authors = "Thomas B. Cochran"
year = 2005
url = "https://npolicy.org/adequacy-of-iaeas-safeguards-for-achieving-timely-detection/"
opened = "2026-11-27"
[source.infcirc-540]
type = "legislation"
title = "Model Protocol Additional to the Agreement(s) between State(s) and the International Atomic Energy Agency for the Application of Safeguards, INFCIRC/540 (Corrected)"
authors = "International Atomic Energy Agency"
year = 1997
url = "https://www.iaea.org/sites/default/files/infcirc540c.pdf"
opened = "2026-11-27"
[source.iaea-sir-2024]
type = "official-docs"
title = "The Safeguards Implementation Report for 2024: Safeguards Statement"
authors = "International Atomic Energy Agency"
year = 2025
url = "https://www.iaea.org/sites/default/files/25/06/sir-2024.pdf"
opened = "2026-11-27"
[source.cwc-text]
type = "legislation"
title = "Convention on the Prohibition of the Development, Production, Stockpiling and Use of Chemical Weapons and on their Destruction"
authors = "Organisation for the Prohibition of Chemical Weapons"
year = 1993
url = "https://www.opcw.org/fileadmin/OPCW/CWC/CWC_en.pdf"
opened = "2026-11-27"
[source.opcw-ec109-dg22]
type = "official-docs"
title = "Update on the Technical Secretariat's Readiness to Conduct a Challenge Inspection or an Investigation of Alleged Use (EC-109/DG.22)"
authors = "OPCW Director-General"
year = 2025
url = "https://www.opcw.org/sites/default/files/documents/2025/07/ec109dg22%28e%29.pdf"
opened = "2026-11-27"
[source.opcw-numbers]
type = "official-docs"
title = "OPCW by the Numbers"
authors = "Organisation for the Prohibition of Chemical Weapons"
year = 2026
url = "https://www.opcw.org/media-centre/opcw-numbers"
opened = "2026-11-27"
[source.brugger-2002]
type = "news"
title = "U.S. May Request Chemical Weapons Convention Inspections"
authors = "Seth Brugger"
year = 2002
url = "https://www.armscontrol.org/act/2002-03/press-releases/us-may-request-chemical-weapons-convention-inspections"
opened = "2026-11-27"
[source.mahley-2001]
type = "official-docs"
title = "Statement by the United States to the Ad Hoc Group of Biological Weapons Convention States Parties"
authors = "Donald A. Mahley, US Department of State"
year = 2001
url = "https://usinfo.org/wf-archive/2001/010725/epf314.htm"
opened = "2026-11-27"
[source.littlewood-lentzos-2024]
type = "essay"
title = "Strengthening the Biological Weapons Convention"
authors = "Jez Littlewood, Filippa Lentzos"
year = 2024
url = "https://www.armscontrol.org/act/2024-12/features/strengthening-biological-weapons-convention"
opened = "2026-11-27"
[source.hoffman-2009]
type = "news"
title = "The other Berlin Wall: How the Soviet bioweapons program was revealed"
authors = "David E. Hoffman"
year = 2009
url = "https://thebulletin.org/2009/11/the-other-berlin-wall-how-the-soviet-bioweapons-program-was-revealed/"
opened = "2026-11-27"
[source.fas-biopreparat]
type = "report"
title = "Biopreparat"
authors = "Federation of American Scientists"
year = 1998
url = "https://nuke.fas.org/guide/russia/agency/bw.htm"
opened = "2026-11-27"
[source.vonbaeckmann-1995]
type = "official-docs"
title = "Nuclear verification in South Africa"
authors = "Adolf von Baeckmann, Garry Dillon, Demetrius Perricos"
year = 1995
url = "https://www.iaea.org/sites/default/files/publications/magazines/bulletin/bull37-1/37105394248.pdf"
opened = "2026-11-27"
[source.thorne-1992]
type = "official-docs"
title = "IAEA nuclear inspections in Iraq"
authors = "Leslie Thorne"
year = 1992
url = "https://www.iaea.org/sites/default/files/publications/magazines/bulletin/bull34-1/34102451624.pdf"
opened = "2026-11-27"
[source.albright-2002]
type = "report"
title = "Iraq's Programs to Make Highly Enriched Uranium and Plutonium for Nuclear Weapons Prior to the Gulf War"
authors = "David Albright"
year = 2002
url = "https://isis-online.org/isis-reports/detail/iraqs-programs-to-make-highly-enriched-uranium-and-plutonium-for-nuclear-we"
opened = "2026-11-27"
[source.iaea-gov-2011-30]
type = "official-docs"
title = "Implementation of the NPT Safeguards Agreement in the Syrian Arab Republic (GOV/2011/30)"
authors = "IAEA Director General"
year = 2011
url = "https://acronym.org.uk/old/archive/docs/1105/Syria%20IAEA%20Report%20May%202011.pdf"
opened = "2026-11-27"
[source.iaea-gov-2003-40]
type = "official-docs"
title = "Implementation of the NPT Safeguards Agreement in the Islamic Republic of Iran (GOV/2003/40)"
authors = "IAEA Director General"
year = 2003
url = "https://www.iaea.org/sites/default/files/gov2003-40.pdf"
opened = "2026-11-27"
[source.iaea-gov-2003-75]
type = "official-docs"
title = "Implementation of the NPT Safeguards Agreement in the Islamic Republic of Iran (GOV/2003/75)"
authors = "IAEA Director General"
year = 2003
url = "https://www.iaea.org/sites/default/files/gov2003-75.pdf"
opened = "2026-11-27"
[source.iaea-gov-2009-74]
type = "official-docs"
title = "Implementation of the NPT Safeguards Agreement and relevant provisions of Security Council resolutions in the Islamic Republic of Iran (GOV/2009/74)"
authors = "IAEA Director General"
year = 2009
url = "https://www.iaea.org/sites/default/files/gov2009-74.pdf"
opened = "2026-11-27"
[source.whitehouse-2009-qom]
type = "official-docs"
title = "Statements by President Obama, President Sarkozy and Prime Minister Brown on Iranian Nuclear Facility"
authors = "The White House"
year = 2009
url = "https://obamawhitehouse.archives.gov/video/Obama-Sarkozy-and-Brown-on-Iranian-Nuclear-Facility/index__q_page=70.html"
opened = "2026-11-27"
[source.reuters-2025-iran]
type = "news"
title = "Verifying Iran's enriched uranium stock is 'long overdue', IAEA report says"
authors = "Francois Murphy (Reuters)"
year = 2025
url = "https://theprint.in/world/verifying-irans-enriched-uranium-stock-is-long-overdue-iaea-report-says/2782711/"
opened = "2026-11-27"
[source.aljazeera-2026-iran]
type = "news"
title = "IAEA urges Iran to allow inspections, points at Isfahan"
authors = "Al Jazeera staff and AFP"
year = 2026
url = "https://www.aljazeera.com/news/2026/2/27/iaea-eyes-isfahan-nuclear-complex-as-it-urges-iran-to-allow"
opened = "2026-11-27"
[source.iaea-gc37-1084]
type = "official-docs"
title = "Implementation of the Agreement between the Agency and the Democratic People's Republic of Korea for the Application of Safeguards (GC(XXXVII)/1084)"
authors = "IAEA Director General"
year = 1993
url = "https://iaea.org/sites/default/files/gc/gc37-1084_en.pdf"
opened = "2026-11-27"
[source.iaea-gov-2004-12]
type = "official-docs"
title = "Implementation of the NPT Safeguards Agreement of the Socialist People's Libyan Arab Jamahiriya (GOV/2004/12)"
authors = "IAEA Director General"
year = 2004
url = "https://securitycouncilreport.org/atf/cf/%7B65BFCF9B-6D27-4E9C-8CD3-CF6E4FF96FF9%7D/Disarm%20GOV200412.pdf"
opened = "2026-11-27"
[source.crs-2004-libya]
type = "report"
title = "Disarming Libya: Weapons of Mass Destruction (RS21823)"
authors = "Sharon A. Squassoni, Andrew Feickert"
year = 2004
url = "https://www.everycrsreport.com/files/20040422_RS21823_9c2b81fe3a3385f6aa0d78a8ac41e3e8cd0cb7ad.html"
opened = "2026-11-27"
[source.newstart-protocol]
type = "legislation"
title = "Protocol to the Treaty between the United States of America and the Russian Federation on Measures for the Further Reduction and Limitation of Strategic Offensive Arms"
authors = "United States of America and Russian Federation"
year = 2010
url = "https://courses.physics.illinois.edu/phys280/sp2014/archive/2010%20New%20START%20Protocol.pdf"
opened = "2026-11-27"
[source.fas-2026-newstart]
type = "report"
title = "The Aftermath: The Expiration of New START and What It Means For Us All"
authors = "Matt Korda, Eliana Johns, Mackenzie Knight-Boyle, Hans Kristensen"
year = 2026
url = "https://fas.org/publication/the-expiration-of-new-start/"
opened = "2026-11-27"
[source.aca-2026-newstart]
type = "news"
title = "New START Expires As U.S. Urges 'Modernized' Treaty"
authors = "Xiaodon Liang"
year = 2026
url = "https://www.armscontrol.org/act/2026-03/news/new-start-expires-us-urges-modernized-treaty"
opened = "2026-11-27"
[source.nrc-2012-ctbt]
type = "report"
title = "The Comprehensive Nuclear Test Ban Treaty: Technical Issues for the United States"
authors = "National Research Council"
year = 2012
doi = "10.17226/12849"
url = "https://www.nationalacademies.org/read/12849/chapter/5"
opened = "2026-11-27"
[source.ctbto-artxiv-2025]
type = "official-docs"
title = "Background document prepared for the Conference on Facilitating the Entry into Force of the CTBT (CTBT-Art.XIV/2025/3)"
authors = "CTBTO Preparatory Commission, Provisional Technical Secretariat"
year = 2025
url = "https://www.ctbto.org/sites/default/files/2025-09/CTBT-Art.XIV-2025-3.pdf"
opened = "2026-11-27"
[source.baker-2023]
type = "preprint"
title = "Nuclear Arms Control Verification and Lessons for AI Treaties"
authors = "Mauricio Baker"
year = 2023
arxiv = "2304.04123"
opened = "2026-11-27"
[source.shavit-2023]
type = "preprint"
title = "What does it take to catch a Chinchilla? Verifying Rules on Large-Scale Neural Network Training via Compute Monitoring"
authors = "Yonadav Shavit"
year = 2023
arxiv = "2303.11341"
opened = "2026-11-27"
[source.wasil-2024]
type = "preprint"
title = "Verification methods for international AI agreements"
authors = "Akash R. Wasil, Tom Reed, Jack William Miller, Peter Barnett"
year = 2024
arxiv = "2408.16074"
opened = "2026-11-27"
[source.ho-2023]
type = "preprint"
title = "International Institutions for Advanced AI"
authors = "Lewis Ho, Joslyn Barnhart, Robert Trager, Yoshua Bengio, Miles Brundage, Allison Carnegie, Rumman Chowdhury, Allan Dafoe, Gillian Hadfield, Margaret Levi, Duncan Snidal"
year = 2023
arxiv = "2307.04699"
opened = "2026-11-27"
[source.scher-2025-agreement]
type = "preprint"
title = "An International Agreement to Prevent the Premature Creation of Artificial Superintelligence"
authors = "Aaron Scher, David Abecassis, Peter Barnett, Brian Abeyta"
year = 2025
arxiv = "2511.10783"
opened = "2026-11-27"
[source.scher-thiergart-2025]
type = "preprint"
title = "Mechanisms to Verify International Agreements About AI Development"
authors = "Aaron Scher, Lisa Thiergart"
year = 2025
arxiv = "2506.15867"
opened = "2026-11-27"
[source.baker-2025-six-layers]
type = "preprint"
title = "Verifying International Agreements on AI: Six Layers of Verification for Rules on Large-Scale AI Development and Deployment"
authors = "Mauricio Baker, Gabriel Kulp, Oliver Marks, Miles Brundage, Lennart Heim"
year = 2025
arxiv = "2507.15916"
opened = "2026-11-27"
[source.hendrycks-2025]
type = "preprint"
title = "Superintelligence Strategy: Expert Version"
authors = "Dan Hendrycks, Eric Schmidt, Alexandr Wang"
year = 2025
arxiv = "2503.05628"
opened = "2026-11-27"
[source.gan-2026-clock]
type = "preprint"
title = "Agreements Have a Clock: Compute Growth and the Verification of AI Restraint"
authors = "Li Gan"
year = 2026
arxiv = "2611.04272"
opened = "2026-11-27"
[source.barnett-scher-2025]
type = "preprint"
title = "AI Governance to Avoid Extinction: The Strategic Landscape and Actionable Research Questions"
authors = "Peter Barnett, Aaron Scher"
year = 2025
arxiv = "2505.04592"
opened = "2026-11-27"
[source.sastry-2024]
type = "preprint"
title = "Computing Power and the Governance of Artificial Intelligence"
authors = "Girish Sastry, Lennart Heim, Haydn Belfield, Markus Anderljung, Miles Brundage, Julian Hazell, Cullen O'Keefe, Gillian K. Hadfield, Richard Ngo, Konstantin Pilz, George Gor, et al."
year = 2024
arxiv = "2402.08797"
opened = "2026-11-27"
[source.avenhaus-2002]
type = "book"
title = "Inspection Games (Handbook of Game Theory with Economic Applications, vol. 3, ch. 51)"
authors = "Rudolf Avenhaus, Bernhard von Stengel, Shmuel Zamir"
year = 2002
doi = "10.1016/S1574-0005(02)03014-X"
url = "https://ideas.repec.org/h/eee/gamchp/3-51.html"
opened = "2026-11-27"
[source.allen-2015-llnl]
type = "report"
title = "Systems Approach to Arms Control Verification (LLNL-CONF-671180)"
authors = "K. Allen, I. Neimeyer, C. Listner, G. Stein, C. Chen, M. Dreicer"
year = 2015
url = "https://www.osti.gov/servlets/purl/1184177"
opened = "2026-11-27"
[source.allison-herzog-2025]
type = "peer-reviewed"
title = "Artificial Intelligence and Nuclear Weapons Proliferation: The Technological Arms Race for (In)visibility"
authors = "David M. Allison, Stephen Herzog"
year = 2025
doi = "10.1111/risa.70105"
arxiv = "2512.07487"
opened = "2026-11-27"
[source.ansari-2026]
type = "preprint"
title = "Hardware-Level Governance of AI Compute: A Feasibility Taxonomy for Regulatory Compliance and Treaty Verification"
authors = "Samar Ansari"
year = 2026
arxiv = "2604.04712"
opened = "2026-11-27"
[source.alramiah-2025]
type = "preprint"
title = "Toward a Global Regime for Compute Governance: Building the Pause Button"
authors = "Ananthi Al Ramiah, Raymond Koopmanschap, Josh Thorsteinson, Sadruddin Khan, Jim Zhou, Shafira Noh, Joep Meindertsma, Farhan Shafiq"
year = 2025
arxiv = "2506.20530"
opened = "2026-11-27"